Current Status  

StartEndWhat System/Service is affectedWhat is happening?What will be affected?Contact PersonStatus


Upcoming Scheduled Maintenance

Listed below in chronological order.

StartEndWhat System/Service is affectedWhat is happening?What will be affected?Contact PersonStatus


0800


2000

ICCICC Quarterly MaintenanceICC Cluster nodes only

help@campuscluster.illinois.edu

SCHEDULED

2022-11-10
0700

2022-11-10 1900

vForge / license serversQuarterly Planned Maintenance

all nodes and services will be unavailable

help@ncsa.illinois.edu

SCHEDULED

2022-11-15 07002022-11-15 1700HOLL-IQuarterly Planned Maintenanceall nodes and services will be unavailablehelp@ncsa.illinois.edu

SCHEDULED


Previous Outages or Maintenance

StartEndWhat System/Service was affected?What happened?What was affected?

Contact Person

Status

2022-11-10
0700

2022-11-10 1200

vForge / license serversQuarterly Planned Maintenance

all nodes and services will be unavailable

help@ncsa.illinois.edu

COMPLETED

2022-11-10 11:002022-11-10 11:50ASD Vsphere, specifically vm's using the tintri storage appliance.Network connections were upgraded to 25G speed.There was no disruption of service with this work.help@ncsa.illinois.edu

COMPLETED

2022-11-07 09002022-11-07 0958set-analytics.ncsa.illinois.eduPhysical Machine Move from 3003 to NPCFThe SET managed Grafana/InfluxDB instance will be unavailableset@ncsa.illinois.edu

COMPLETED

2022-11-04 19002022-11-04 1930SET TaigaSET  caused a failover of tgio02 and then failed back.  This fixed the mounting issue.Clients with taiga currently mounted may experience slow or stopped IO during the failover.  Failover completed properly and solved the mounting issue.set@ncsa.illinois.edu

COMPLETED

2022-11-03 11322022-11-04 1930Delta

Taiga filesystem (/taiga/ and /projects/) problem on dt-login01 and dt-login02

The issue is limited to dt-login01 and dt-login02. Commands attempting to access /taiga/ or /projects/ on these nodes will hang.

Users are advised to use dt-login03 or the login.delta.ncsa.illinois.edu "round robin" address

UPDATE: dt-login01 and dt-login02 are fully functional again and back in the login.delta.ncsa.illinois.edu DNS "round robin".

help@ncsa.illinois.edu

COMPLETED

2022-11-03 00482022-11-03 0106SET Taigatgio02 and tgio04 failed overOSTs on the two nodes were inaccessible until the reboots were complete. This is a known issue with a vendor patch in progress. set@ncsa.illinois.eduCOMPLETED


2022-11-03 06002022-11-03 0615NCSA GitLabGitLab was upgraded to latest versionAll GitLab services was unavailable for a few minutes.

help@ncsa.illinois.edu

COMPLETED

2022-11-02 17002022-11-02 2000DNS ServicesPatching for out of cycle security updates.DNS1 and DNS2 will be patched and rebooted (staggered) to applied needed updates.help+neteng@ncsa.illinois.edu

COMPLETED

2022-11-01 18002022-11-02 0000NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares were unavailable during maintenance.  Users were unable to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing was unavailable.help@ncsa.illinois.edu

COMPLETED

0800

0830

idp.ncsa.illinois.eduEnable Duo Universal PromptNCSA Identity Provider will now use Duo Universal Prompthelp+idp@ncsa.illinois.edu

COMPLETED

2022-10-25 08002022-10-25 0900NCSA building 1st Floor Wifi / Security CamerasTech Services is replacing a networking switch on the 1st for of the NCSA building that powers the Access Points on the first floor.This should be a short down time, but the access points will reboot while we migrate cables to the new switch.  help+neteng@ncsa.illinois.edu

COMPLETED

2022-10-19 07:002022-10-20 07:15Some SSH Bastion HostsOut-of-Cycle reboot needed after failed patching.
Will reboot tomorrow at 07:00am
bwbh1.ncsa.illinois.edu
bwbh3.ncsa.illinois.edu
cerberus1.ncsa.illinois.edu
cerberus3.ncsa.illinois.edu
ache-bastion-1.ncsa.illinois.edu
ngale-bastion-1.ncsa.illinois.edu
help+security@ncsa.illinois.edu

COMPLETED

2022-10-18 15:002022-10-18 15:30Radiant instance creation/managementsystem setting changesNo noticeable impactpl@illinois.edu

COMPLETE

2022-10-18 12:002022-10-18 12:05identity, email to NCSA addressessystem updates 1 minute window to cause email delays and identity frontend unavailablecpl@illinois.edu

COMPLETE

2022-10-14 22002022-10-15NCSA office firewall upgradeUpgrading code on the office firewall.Office networks will be offline during this upgrade.help+neteng@ncsa.illinois.edu

COMPLETE

2022-10-13 17002022-10-13 1800SSLVPN MaintenanceThe second member of the HA pair will be put back into service.The second member was added with no outage.help+neteng@ncsa.illinois.edu

COMPLETE

2022-10-12 11:002022-10-12 12:00ASD Vsphere, specifically vm's using the tintri storage appliance.Network connection on tintri storage box were switch to new hardware but their speed was unchanged. Additional work will need to be scheduled to complete the speed increase.This had no service impact.help@ncsa.illinois.edu

INCOMPLETE

2022-10-10 00002022-10-10 1040NCSA VPNThe NCSA VPN had a member of the HA pair fail and licensing didn't fail over. Users were unable to connect to the VPN until the licensing issue was resolved.help+neteng@ncsa.illinois.edu

COMPLETE

2022-10-03 08002022-10-03 0845HOLL-Iinstall security updates and reboot
help@ncsa.illinois.edu

COMPLETE

2022-09-30 06002022-09-30 0615NCSA GitLabGitLab was upgraded to latest versionAll GitLab services were unavailable for a few minutes.

help@ncsa.illinois.edu

COMPLETE

2022-09-27 11002022-09-28 1700odd numbered bastion hosts (cerberus1, cerberus3, ache-bastion-1, ngale-bastion-1, etc.)puppet code refactoring for SSH configs

More changes were pushed out around 5p on 2022-09-28 and we believe the SSHD config issues are resolved.  You can use the even numbered (cerberus2, cerebrus4) bastions as a work-around if any issues persist.

help+security@ncsa.illinois.eduRESOLVED


2022-09-28 09302022-09-28 1050Jira outgoing emailoutgoing email degradedJira failed to send some/most outgoing email during this time frame.help@ncsa.illinois.edu

RESOLVED

2022-09-24 14452022-09-25 1045GraniteBuilding power outage caused Disk Storage Unit to power cycleAny user operations on the cluster were interrupted and unavailable until resolution.bdickin2@illinois.edu

COMPLETE

2022-09-21 08002022-09-21 0930HOLL-IChange CS-2 execution mode to PipelinedExecution mode of the CS-2 was changed from Weight Streaming to Piplined.help@ncsa.illinois.edu

COMPLETE

2022-09-08 08002022-09-10 1100GraniteGranite Bi-annual Maintenance (now back in service)Any ingest or retrieval to/from the Archivebdickin2@illinois.edu  slack-id: briandi
set@ncsa.illinois.edu 

COMPLETE

2022-09-09 09432022-09-09 1457Jiraoutgoing email degradedJira failed to send some/most outgoing email during this time frame.help@ncsa.illinois.edu

COMPLETE

2022-09-08
0700

2022-09-08 1010: license servers

2022-09-09
0230: vForge

vForge / license serversQuarterly Planned Maintenance

all nodes and services will be unavailable

help@ncsa.illinois.edu

COMPLETE

 

0500

0600

ASD VM services netRouting in the switch stacks is being swiched from NCSA 3003 to NPCFAll systems on the 141.142.192.x network will be unreachable for up to 5 minutes.help@ncsa.illinois.edu

COMPLETE

2022-08-31 18002022-09-01 0700NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares were be unavailable during maintenance.  Users were unable to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing was unavailable.help@ncsa.illinois.edu

COMPLETE

1730

1830

JiraJira service will be restartedJira will not be availablehelp@ncsa.illinois.edu

COMPLETE

08-24-22 183008-26-22 0800Granite Tape ArchiveFS crash and lockupA few files that were transferred into the archive shortly before the crash needed to be re-transferred.

bdickin2@illinois.edu  slack-id: briandi
set@ncsa.illinois.edu 


COMPLETE

2022-08-17
1200
n/aAll LSST hosts at NCSAServers will be shutoff and retired.All LSST servers and services at NCSA.lsst-admin@ncsa.illinois.edu

COMPLETE

2022-08-17 07002022-08-17 1320NightingaleQuarterly Planned MaintenanceAll Nightingale servers and services will be unavailable (other than the ngale-bastion* nodes)help@ncsa.illinois.edu

COMPLETE

2022-08-16 0700

2022-08-17 1305

HOLL-IQuarterly Planned Maintenance

All HOLL-I servers and services will be unavailable

2022-08-16 1505 - HOLL-I cluster return to service, but CS-2 remains offline for further work; CS-2 expected return to service by 2022-08-17 1000

2022-08-17 1305 - HOLL-I CS-2 is returned to service

help@ncsa.illinois.edu

COMPLETE

2022-08-09 20002022-08-09 2300Office Networks on 2nd FloorCode updates on office network switches.Office ports will be offline as switches reboot. help+neteng@ncsa.illinois.edu

COMPLETE

2022-08-10 20002022-08-10 2300Office Networks on 3rd FloorCode updates on office network switches.Office ports will be offline as switches reboot. help+neteng@ncsa.illinois.edu

COMPLETE

2022-08-11 20002022-08-11 2300Office Networks on 4th FloorCode updates on office network switches.Office ports will be offline as switches reboot. help+neteng@ncsa.illinois.edu

COMPLETE

2022-08-03
0900
2022-08-03
1000
NPCF Center-wide management firewallsSecondary firewall will be upgradedNo impact to services is anticipated.  Traffic will flow normally through the primary firewall as the secondary is upgraded.help+security@ncsa.illinois.edu

COMPLETE

2022-07-27
0940
2022-07-28
15:36
ACHE, Nightingale Several accounts have had their Covered Entity status revokedAffected users/accounts will not be able to access resources that requires Covered Entity enrollment 

help+hippa@ncsa.illinois.edu

RESOLVED

2022-07-27
0900
2022-07-27
1000
NPCF Center-wide management firewallsPrimary firewall will be upgradedNo impact to services is anticipated.  Traffic will be failed over to the secondary firewall, the primary will be updated, and then traffic will be moved back to the primary.help+security@ncsa.illinois.edu

COMPLETE

0900

0915

JiraAdditional LDAP group will be added for exclusion to sync with LDAP users.In theory, nothing.help@ncsa.illinois.edu

COMPLETE

0800

  2000

ICCICC Quarterly MaintenanceAll ICC services

help@campuscluster.illinois.edu

COMPLETE

2022-07-19 07002022-07-19 0900RadiantVictoria UpdateMinimally disruptive, brief interruptions to OpenStack services, such as the Horizon dashboardradiant-admin@ncsa.illinois.edu

COMPLETE

2022-07-14
2345
2022-07-14
2359
WikiThe service will be restarted in order to increase the login timeout.Wiki will be unavailable for about 5 mins while it restarts.

COMPLETE

2022-07-08
1700
2022-07-11
0800
LSST hosts in NCSA 3003Due to a full building power outage at NCSA on Sunday, 10 July, some LSST servers will be unavailable over the weekend. Servers will be shutdown at COB on Friday and returned to service on Monday morning.lsst-dbb-fts1
lsst-dbb-rucio
lsst-demo
lsst-dm-monitor
lsst-int-monitor
lsst-mon-dev
lsst-pup
lsst-test5
lsst-xfer
l1-cl-arctl
l1-cl-fault
l1-cl-header
nts-ccamfwdr1
nts-acamfwdr2
nts-acamfwdr1
lsst-admin@ncsa.illinois.edu

COMPLETE

2022-07-11 08:302-22-07-11 9:30All ITSM (CMDB) VMsAll ITSM VMs are currently down. Ticket has been created to get them brought back up.Production CMDB service (openDCIM) is not availablekimber7@illinois.edu

RESOLVED

2022-07-10 0700

2022-07-10 1430

NCSA building powerBuilding power feed work for multiple campus BuildingsAVL, LSST, ISL and Software standard services were down from Friday afternoon until Monday morning.Daniel Lapine 

COMPLETE

2022-07-8

1600

2022-07-11

0900

cerberus2 and cerberus4Campus is doing work on a common feed that affects multiple buildings, include the NCSA Building. Work is scheduled from 0700-1700, but may finish earlyVM hosts running these 2 bastions will be down for the weekend due to the scheduled power work at NCSAhelp+security@ncsa.illinois.edu

COMPLETE

2022-07-06 17302022-07-06 2030Wiki (wiki.ncsa.illinois.edu)Confluence and MySQL upgradeswiki will be down during the upgrade

COMPLETE

2022-07-05 18002022-07-05 2130NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares were unavailable during maintenance.  Users were unable to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing was unavailable.help@ncsa.illinois.edu

COMPLETE

2022-07-05 1800N/AiForgeend of serviceiForge was removed from service. Operations have moved to the new vForge virtual cluster.help+industry@ncsa.illinois.edu