Current Status  

StartEndWhat System/Service is affectedWhat is happening?What will be affected?Contact PersonStatus
2022-01-24??Failed line card on neo-hpc-1 switchLine card failure is affecting devices that are plugged into Neo-hpc-1 aggregation switch.

Known services affected

  • Fabric
help+neteng@ncsa.illinois.edu

IN PROGRESS


Upcoming Scheduled Maintenance

Listed below in chronological order.

StartEndWhat System/Service is affectedWhat is happening?What will be affected?Contact PersonStatus
2022-01-19 08002022-01-19 2000ICCICC Quarterly MaintenanceAll ICC services

help@campuscluster.illinois.edu

SCHEDULED

2022-01-24 18002022-01-25 0700NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares will be unavailable during maintenance.  Users will not able to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing will be unavailable.help+service@ncsa.illinois.edu

SCHEDULED

2022-01-252022-01-27Facility UPSReplace UPS batteriesAll systems with facility UPS feedrantissi@illinois.edu

SCHEDULED

2022-04-20 08002022-04-20 2000ICCICC Quarterly MaintenanceICC Cluster nodes only

help@campuscluster.illinois.edu

SCHEDULED

2022-07-20 08002022-07-20 2000ICCICC Quarterly MaintenanceAll ICC services

help@campuscluster.illinois.edu

SCHEDULED

2022-10-19 08002022-10-19 2000ICCICC Quarterly MaintenanceICC Cluster nodes only

help@campuscluster.illinois.edu

SCHEDULED


Previous Outages or Maintenance

StartEndWhat System/Service was affected?What happened?What was affected?

Contact Person

Status
2022-01-18 08002022-01-18 0830cilogon.orgUpgrade MyProxy CA servers to CentOS 7Upgrade back-end MyProxy CA VMs from CentOS 6 to CentOS 7. No downtime is expected.help@cilogon.org

COMPLETE

2022-01-14 06002022-01-14 1715Business IT database had bad data.A database that NCSA mirrors from campus changed without notice breaking our MIS system. Business IT isolated the issue and corrected the data.Multiple complex systems have been affected by this data corruption issue.help+service@ncsa.illinois.edu

RESOLVED

2022-01-14 08002022-01-14 1720NCSAnet wirelessNCSAnet Wireless was unavailable due to bad data in ldapUsers couldn't connect to the NCSAnet wireless networkhelp+neteng@ncsa.illinois.edu

RESOLVED

2022-01-05 11002022-01-05 1145CMDBVersion V1.5.20211223 releaseCMDB database will be unavailable for a few moments; openDCIM will be unavailable for a few moments.kimber7@illinois.edu

COMPLETE

2021-12-20 18302021-12-20 2030JIraVersion Upgrade to address security issueJira will be unavailablehelp+service@ncsa.illinois.edu

COMPLETE

2021-12-17 13002021-12-17 1340CMDBVersion V1.4.20211217 releaseCMDB database will be unavailable for a few moments; openDCIM will not  be affected.

kimber7@illinois.edu

COMPLETE

2021-12-17 06002021-12-17 0622NCSA GitLabThe server was updated with some new Puppet configurations.GitLab services was unavailable for a few minutes as the SSL certificate for the service was updated.help+service@ncsa.illinois.edu

COMPLETE

2021-12-16 14002021-12-16 1430HTTP web proxy: httpproxy.ncsa.illinois.eduNCSA's general purpose HTTP web proxy server was rebuilt.HTTP web proxying through httpproxy was unavailable.help+service@ncsa.illinois.edu

COMPLETE

2021-12-10 07002021-12-10 1345iForgeInfiniBand switch maintenanceAll systems unavailableiforge-admin@lists.ncsa.illinois.edu

COMPLETE

2021-12-10 09002021-12-10 1000Bastion Hosts (Production group B)Patching out of cycleBastion Hosts (Production group B) were individually unavailable during reboothelp+security@ncsa.illinois.edu

COMPLETE

2021-12-09 09002021-12-09 0931Bastion Hosts (Production group A)Patching out of cycleBastion Hosts (Production group A) were individually unavailable during reboot

COMPLETE

2021-12-09 08002021-12-09 0900All IDDS servicesIDDS Postgres and Ruby on Rails upgradesAll IDDS servicestolbert@illinois.edu

COMPLETE

2021-12-09 06002021-12-09 0613NCSA GitLabGitLab was updated to latest versionAll GitLab services were unavailable for about 5 minuteshelp+service@ncsa.illinois.edu

COMPLETE

2021-12-07
1400
2021-12-07
1443
LSST

Kubernetes on NTS is not working properly after updates

Kubernetes on NCSA Test Standlsst-admin@ncsa.illinois.edu

RESOLVED

2021-12-07
0800
2021-12-07
1400
LSST

LSST Quarterly Maintenance

All LSST services hosted at NCSAlsst-admin@ncsa.illinois.edu

COMPLETE

2021-12-07

0930

2021-12-07

1030

ACHE Firewallssoftware maintenanceFirewalls will be upgraded using fail over procedures  - no traffic impact expectedJames Eyrich - eyrich on slack

COMPLETE

2021-11-30 0900

2021-11-30

1100

TechServices connectivity at NPCF (wireless, facilities, IRIS, Prox scanners).Tech Services will be replacing several network devices at NPCF that will impact a variety of services at NPCF.  The Tech Services will be replacing 3 devices at NPCF.  Along with sporadic wireless outages, some facilities networks (such as IRIS and card readers) will be offline while some equipment is replaced.  The main router replacement should only take 5 mins or so.  The wireless switches will take 15-20 mins each.help+neteng@ncsa.illinois.edu

COMPLETE

2021-11-30 18002021-12-01 00:15NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares were unavailable during maintenance.  Users were not able to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing was unavailable.help+service@ncsa.illinois.edu

COMPLETE

2021-11-19 12:522021-11-19 13:22lsst-esx08server crashed

The following VMs rebooted:

Idap-Isst-ncsa3
Isst-condordev-cm01
Isst-condordev-sub01
Isst-git
Isst-influxdb-0
Isst-kubh02
Isst-kubh05
Isst-kubh08
Isst-login03
Isst-logintest01
Isst-ora-dbm01
Isst-pup-npcf
Isst-ss-cfg02
Isst-telegraf-0

lsst-admin@ncsa.illinois.edu

RECOVERED

2021-11-18 14002021-11-18 1750ICI Metrics & AlertsMigration to RHEL 8, ASD Puppet control, & CILogon authenticationThe viewing of ICI dashboards and the firing of ICI alerts was unavailable during this migrationmalone12@illinois.edu, bglick@illinois.edu

COMPLETE

2021-11-11 09252021-11-11 0940NCSA websiteCommunications launched the newly redesigned NCSA site.During launch, you may experience some down-time between while NCSA’s technical team re-points the URL to the new site.communications@lists.ncsa.illinois.edu

COMPLETE

2021-11-09 07002021-11-09 1545iForgeQuarterly MaintenanceAll systems unavailableiforge-admin@lists.ncsa.illinois.edu

COMPLETE

2021-11-03

0000

2021-11-04Netdot SSL CertificateThe SSL certificate for Netdot expired and network engineering replaced it with a new one. SSL certificate expired. Service remained available throughout the periodhelp+neteng@ncsa.illinois.eduCOMPLETE


2021-11-03

1100

2021-11-03

1400

ESnet 100G link migration. ESnet engineers will be migrating NCSA's 100G link to the new ESnet6 infrastructure. The link will be down during the migration.  Traffic will fall back to alternative paths. help+neteng@ncsa.illinois.edu

COMPLETE

2021-11-03

1100

2021-11-03

1120

NCSA GitLabGitLab was updated to latest version.All GitLab services were be unavailablehelp+service@ncsa.illinois.edu

COMPLETE

2021-11-03 10002021-11-03 1020Core Router Linecard ReplacementNeteng replaced a linecard in one of the core routersAll connections to this linecard are redundant and no outage has been reported.neteng@ncsa.illinois.edu

COMPLETE

2021-11-02 15:202021-11-02 16:37Production version of DCIM for CMDB (https://ncsa-cmdb.ncsa.illinois.edu)Invalid certificate issue(Fixed) 
The production version of CMDB will be unavailable until new certificate is received and applied. 

In the interim, the test server (https://ncsa-cmdb-test.ncsa.illinois.edu) has been made available for use, with all current data.
Kimber Blum (kimber7@illinois.edu)

COMPLETE

2021-11-02 08002021-11-02 0900cilogon.orgUpdate to OA4MP v5.2.3Address several small issues in the back-end servicehelp@cilogon.org

COMPLETE

0600

0710

JiraJira UpgradeJirahelp+service@illinois.edu

COMPLETE

2021-10-25 18002021-10-26 0018NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares will be unavailable during maintenance.  Users will not be able to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing will be unavailable.help+service@ncsa.illinois.edu

COMPLETE

2021-10-20 08002021-10-20 1800ICCP

ICCP Quarterly Maintenance

  • VLAN Change for IPMI network
  • OS update
ICCP Cluster nodes onlyhelp@campuscluster.illinois.edu

COMPLETE

2021-10-20 07002021-10-20 0715IDDSIDDS maintenance (puppet changes)All IDDS servicesidds-admin@ncsa.illinois.edu

COMPLETE

2021-10-15 12302021-10-15 0713NCSA GitLabServer ran out of disk spaceAll GitLab services were unavailablehelp+service@ncsa.illinois.edu

RESOLVED

2021-10-11 08002021-10-11 1900Nightingale, ACHEPlanned maintenance on the Nightingale cluster and the ache-dist switchThere was an outage for the following services during the maintenance:
  • ALL Nightingale hosts/services
  • ALL firewalled traffic in/out of ACHE, which includes admin access & monitoring in/out of ALL of ACHE (this portion was complete by 1140)
    • network access to ALL of the ache-esxi-hosted VMs, including ache- and ngale-bastion hosts
    • ACHE FW IPMI interfaces
help+service@ncsa.illinois.edu

COMPLETE

2021-10-04 10002021-10-04 1005www.ncsa.illinois.edu per-user web directoriesPer-user web directories on the main NCSA website are being redirected to a new website dedicated to per-user web directories.URLs like www.ncsa.ncsa.illinois.edu/People/* are redirected to their new home at https://users.ncsa.illinois.edu/*.help+service@ncsa.illinois.edu

COMPLETE

2021-09-30
0800
2021-09-30
1200
LSST

LSST Quarterly Maintenance

  • OS updates
  • K8S updates
All LSST services hosted at NCSAlsst-admin@ncsa.illinois.edu

COMPLETE

2021-09-29 08002021-09-29 0900cilogon.orgUpdate to OA4MP v5.2.2Update Java database libraries, and address several small issueshelp@cilogon.org

COMPLETE

2021-09-29 08002021-09-29 0813CMDB / openDCIMInstalling/upgrading to CMDB release Sep2021The openDCIM front end of CMDB will be down for 15-30 minutes

COMPLETE

2021-09-28 07002021-09-28 1554NPCF work on facility powerDeenergizing power to transformer TX-4C-1020, pulling and terminating busduct cabling from transformer to room 2020. One third of Sonexion racks will lose source 1 power (Feed C) and will continue to operate on source2 degrading reliability by losing power redundancy.

COMPLETE

2021-09-28 07002021-09-28 0900Blue WatersA rack of scratch lost power during the power outage.Scratch was partially unavailable due to TOR power resiliency issue.

COMPLETE

2021-09-28 08002021-09-28 0900idp.ncsa.illinois.eduAssert eduPersonAssurance Cappuccino profile for NCSA StaffNCSA Staff logging in with the NCSA Identity Provider will be able to get Silver CA certificates from cilogon.orghelp+idp@ncsa.illinois.edu

COMPLETE

2021-09-21-14:502021-09-21-15:02vcenter appliance controlling ASD vspherevcenter appliance was upgradedvsphere.ncsa.illinois.edu was off-line for 12 minutes.help+service@ncsa.illinois.edu

COMPLETE

2021-09-21 07002021-09-20 1115Blue WatersPower Work caused non redundant switches and misconfigured servers to shutoffBlue Waters Compute, Login and Schedulerbw-admin@ncsa.illinois.edu

COMPLETE

2021-09-20 1800

2021-09-20 2130

NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares were unavailable during maintenance.  Users were not be able to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing was unavailable.help+service@ncsa.illinois.edu

COMPLETE

2021-09-14 00002021-09-14 0600Internet2 WAN circuitInternet2 will be migrating our WAN circuit to new hardware. Traffic over that path will reroute while the change happens.  We anticipate the migration to take less than 30 mins.help+neteng@ncsa.illinois.edu

COMPLETE

 0600

 0900

WikiUpgrade to next versionWiki will be unavailable

help+service@ncsa.illinois.edu

COMPLETE

2021-09-09 06002021-09-09 0700NCSA VPNSoftware UpgradesThe appliances hosting the NCSA VPN will be patched. Users will experience a brief disconnect as load is failed over between the appliances.help+neteng@ncsa.illinois.edu

COMPLETE

2021-09-08 13002021-09-08 1400Group prod_b Bastion hostsOut of cycle patchingBastion hosts in group prod_b will be patched and rebooted. (see MOTD for group assignment)help+security@ncsa.illinois.edu

COMPLETE

2021-09-08 09002021-09-08 1000Group prod_a Bastion hostsOut of cycle patchingBastion hosts in group prod_a will be patched and rebooted. (see MOTD for group assignment)help+security@ncsa.illinois.edu

COMPLETE

2021-09-02 9:30 AM2021-09-02 1PMPDU in rack AA81We are replacing a PDU in NPCF rack AA81All systems in the rack have redundant power connections.  No service outages are expected from this workhelp+service@ncsa.illinois.edu

COMPLETE

2021-09-01 07002021-09-01 0800cilogon.orgUpdate to OA4MP v5.2.1Device Authorization Grant Flow transactions will be stored in database rather than in memoryhelp@cilogon.org

COMPLETE

 1200

 1205

WikiSecurity patch is being appliedWiki will be downhelp+service@ncsa.illinois.edu

COMPLETE

2021-08-25 9:00am2021-08-25 6:45pmBlue Waters System reboot due to blade fallout coinciding with HSN reroute and SMW not recovering.All jobs interruptedjenos@illinois.edu

COMPLETE

2021-08-19 05382021-08-19 0700IRST systems hosted on IRST Node 2Storage controller failure, all VMs taken offlinesome prod_b systems, and non-redundant services.eyrich@illinois.edu

RESOLVED

2021-08-19 5:342021-08-19 6:20cilogon.orgStorage controller failure in IRST VM farmcilogon.org was unreachable until we initiated fail-over to our backup servers at NICS.help@cilogon.org

COMPLETE

2021-08-18 11362021-08-18 1156NCSA WikiTest instance caused interference.NCSA Wikihelp+service@ncsa.illinois.edu

COMPLETE

2021-08-17 05002021-08-17 0700NCSA/NPCF Wide Area NetworkBetween 5:00AM and 7:00 AM CDT on 08/17/2021, Campus ICCN Engineers will be upgrading firmware on the ICCN router 710rtr at the Starlight facility in Chicago.Our peerings with MREN and OmniPoP will go down. All traffic destined for those peerings will reroute via other peerings, so no production impact is expected.help+neteng@ncsa.illinois.edu

COMPLETE

2021-08-16 18002021-08-17 0000NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares will be unavailable during maintenance.  Users will not able to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing will be unavailable.help+service@ncsa.illinois.edu 

COMPLETE

2021-08-12 9:542021-08-12 1012JiraAttempted snapshot of Jira in vSphere was too intensive for the systemJirahelp+service@illinois.edu

COMPLETE

2021-08-10
2000
2021-08-011
0000
Radiant API and Web access

Radiant cluster name change.During this time access to the API endpoints and the Horizon web dashboard will be intermittently unavailable.  Instances will continue to run and be available over the network with no interruptions.

radiant-admin@ncsa.illinois.edu

COMPLETE

2021-08-10 07:002021-08-10 17:10iForgeQuarterly MaintenanceAll systems unavailableiforge-admin@lists.ncsa.illinois.edu

COMPLETE

2021-08-09 14212021-08-09 1440NCSA WikiDB conflict configuration with Wiki & Wiki-TestNCSA Wiki was unaccessiblehelp+service@ncsa.illinois.edu

COMPLETE

2021-08-05 10002021-08-05 1030NPCF Core Router - Linecard RebootA problem was identified on one of the line cards in our core router requiring a reboot of the linecard. The linecard was successfully rebooted and we will continue monitoring the hardware for further issues.All connections to this linecard are redundant and there was no impact to users.neteng@ncsa.illinois.edu

COMPLETE

2021-08-05
0800
2021-08-05
1000
LSST

LSST Emergency OS Patching

LSST services hosted at NCSA except:

  • NTS will remain up (has already been patched)
lsst-admin@ncsa.illinois.edu

COMPLETE

2021-08-04
0800
2021-08-04
1700
Radiant API and Web access

Installation of new Radiant cluster

Cluster name changes are starting at 1100; This will make the horizon dashboard unreachable.
During this time access to the API endpoints and the Horizon web dashboard will be intermittently unavailable.  Instances will continue to run and be available over the network with no interruptions.

radiant-admin@ncsa.illinois.edu

COMPLETED

2021-08-04 07002021-08-04 0800cilogon.orgUpdate to OA4MP v5.2.0Added support for Device Authorization Grant Flow (RFC 8628)help@cilogon.org

COMPLETED

2021-08-03
0800
2021-08-03
1700
Radiant API and Web access

Installation of new Radiant cluster


During this time access to the API endpoints and the Horizon web dashboard will be intermittently unavailable.  Instances will continue to run and be available over the network with no interruptions.

radiant-admin@ncsa.illinois.edu

COMPLETED

2021-08-03 9:00 am2021-08-03 11:30 amRadiant ClusterA change was made to the firewall that unintentionally restricted access for instances and other internal cluster communication.Access to instances and workloadradiant-admin@ncsa.illinois.edu

RESOLVED

2021-07-31 06002021-07-31 0630CILogon hosted servicesInfrastructure maintenanceDuring this time each service hosted by CILogon including COmanage Registry, LDAP, Grouper, SAML proxy, and MDQ will become unavailable for a short time. Each individual service outage will last less than 5 minutes. Services that will not be impacted include: * OIDC clients that do not query LDAP for resolving attributes * X.509 certificate issuance and certificate revocation lists * LIGO and GW-Astronomy serviceshelp@cilogon.org

COMPLETE

2021-07-29 13002021-07-29 1400IRST-run bastion hosts (pool B)Security patchingHosts managed by IRST will be patched and rebooted. Only hosts in pool B will be patched at this timehelp+security@ncsa.illinois.edu

COMPLETE

2021-07-29 09002021-07-29 1000IRST-run bastion hosts (pool A)Security patchingHosts managed by IRST will be patched and rebooted. Only hosts in pool A will be patched at this timehelp+security@ncsa.illinois.edu

COMPLETE

2021-07-28 10002021-07-28 1050LSSTOS Updates on only NCSA Test Stand (NTS)Only the LSST NCSA Test Stand (NTS) services hosted at NCSAlsst-admin@ncsa.illinois.edu

COMPLETE

2021-07-27 06002021-07-27 0900JiraUpgradeJira will be unavailable

help+serverice@ncsa.illinois.edu

COMPLETE

2021-07-26 18002021-07-27 0000NCSA File & Print ServersScheduled Windows Server MaintenanceFile & Print Shares were unavailable during maintenance.  Users were not able to access shares on Fileserver (e.g. home, busnoff, hr, etc.), and printing was unavailable.help+service@ncsa.illinois.edu 

COMPLETE

2021-07-21
0800
2021-07-21
2900
ICCP

ICCP Quarterly Maintenance

  • TBD
All ICCP services

help@campuscluster.illinois.edu


COMPLETE

2021-07-21 15:242021-07-21 21:50ASD Vshpere cluster in 3003One of the 4 hypervisors in the cluster paniced.  Unscheduled preventative maintenance is being preformed on it and the other 3 nodes in the cluster.after the initial outage at 15:24, there should be no additional outages.help+service@ncsa.illinois.edu

COMPLETE

2021-07-13 07002021-07-13 0800cilogon.orgUpdate to OA4MP v5.1.4.The OAuth2/OIDC backend of the CILogon Service will be updated to OA4MP v5.1.4.help@cilogon.org

COMPLETE

2021-07-08 08002121-07-08 1000OpenAFSThe remaining OpenAFS database servers were upgraded.No service impacts were seenhelp+service@ncsa.illinois.efu

COMPLETE

2021-07-07 06002021-07-07 0800CILogon AWS Hosted ServicesUpgrading AWS RDS Aurora MySQL v5.6 to v5.7COmanage Registry and Grouper services hosted by CILogon will be unavailablehelp@cilogon.org

COMPLETE

2021-07-01

2140

2021-07-01

1430

Horizon dashboard access was down for the entire period. Cluster networking was down from 1200 to1430.Investigations into Horizon  dashboard accessibility issues resulted in the application of an incorrect default network gateway for the cluster around noon. This was corrected and networking functionality restored around 1400. Instances began recovering soon thereafter.Radiant admins believe running instances have recovered on their own but we advise everyone to check their systems and report any issues they see to the help desk.
help@ncsa.illinois.edu

RESOLVED

2021-07-01

0247

2021-07-01

1300

Various systems in NPCF, ACB, NCSA

There was a power event in the Champaign-Urbana area at around 2:47AM today. Details about the cause are currently unknown.  This event caused disruptions to systems at the NCSA building, NPCF and ACB. Known issues have generally been resolved but there may be unidentified issues lingering. If you encounter any problems, please notify NCSA help desk staff (help@ncsa.illinois.edu).

Multiple systems/services were impacted. All have been recovered and return to normal operations is complete.NCSA help desk

RESOLVED

?

IN PROGRESS

RESOLVED

SCHEDULED


  • No labels