Work Completed

  • KNSG
    1. Resolved KNSG-91, this issue involved automating the retrieval of results after the workflow finishes. Users can now simply right click on a finished workflow and select to retrieve results. The results are downloaded and added to their scenario. This issue took longer than anticipated due to instability in the scratch space on ABE, links to results would not always resolve properly (a known system issue). We made the decision to allow users to specify where the results should be placed (e.g. user-home) and made this part of the workflow.
    2. Resolved KNSG-93, this issue involved simplifying the User Interface for launching workflows. The user was asked to specify the gridftp URI to use for transferring the data. This was redundant since the user was already asked to specify the resource to run on and the resource's XML file contained the gridftp URI. This is now fixed.
    3. Resolved KNSG-94, this issues involved allowing users to delete multiple files from the repository or from their scenario. Initially only single file delete/remove was implemented.
    4. Built and tested version 0.8 of eAIRS.
    5. Released version 0.8 of eAIRS on Friday October 1, 2010 and updated the wiki with release details.
  • MAEviz
    1. Sent email to a SYNER-G user with instructions for accessing the MAEviz Subversion Repository. I also updated the MAEviz wiki with the correct instructions (the displayed link was correct, but the actual underlying hyperlink in the wiki was incorrect).
  • Filled out and returned to HR my Conflict of Interest form.

Work Planned

  • Work on KISTI and release version 0.8 of eAIRS on Friday October 1, 2010.

Comments

This week went as planned. Next week I will continue to work on documentation and tying up loose ends for the KISTI Project as the project wraps up.