This wiki site will be offline Thursday, Oct 5th, 2023, from 0600 to 0830 in order to upgrade Confluence
Child pages
  • Tesla cluster
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

System Configuration

Needs: 

  • 8 power cables
  • 8 outlet spaces
  • 8 InfiniBand FDR cables

8 Dell C4130 Servers

  • 2 Intel Xeon E5-2667 v3 CPUs (8T/16C @ 3.2GHz)
  • 256GB RAM
  • 4 Tesla K40m GPUs
  • 2 1.2TB 10K SAS hard drives (in RAID 1(?))
    • One of the PSUs is replaced with a 4-drive bay
  • InfiniBand FDR 56Gb/s
  • 1600W PSU

Service Tags:

  • 73W5X52
  • 73X9X52
  • 73Y3X52
  • 7414X52
  • 76NBX52
  • 76R5X52
  • 77M7X52
  • 77M8X52

  • No labels