Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

START
ENDWhat System/Service is affectedWhat is happening?What will be affected?Contact Person

2018-11-06

06:00 am

2018-11-06

04:00 pm

Networking NetSure DC power supply

Tape Library QBERT and DIGDUG

iForge racks:

  • Y121, Z121, AA121, CC121, DD121
De-energize distribution power panel DP-6C-020 to install new power panel PPC4

Loss of power to the core network DC power supply West (B), the network is 2N power feed, no impact on the network.

Loss of power to two tape libraries, a temporary power feeds will be provided.

iForge system will be powered down for quarterly maintenance.


MO Rantissi:

rantissi@illinois.edu

918-820-225


2018-10-30 9:00 p.m.

2018-10-30

11:00 p.m.

NCSA DHCPPatchesThe DHCP server will be unavailable periodically for reboots and patching. Possible timeouts for DHCP, but generally no interruptions are expected.help+neteng@ncsa.illinois.edu
2018-11-01
7.00PM 
2018-11-01
9.00PM 
wired networking on 4th floor in NCSA buildingSoftware upgrade on network closet switchesWired network, VOIP phones on 4th floor. NCSAnet Wireless will remain available during maintenance window.help+neteng@ncsa.illinois.edu

...