...
Start | What System/Service is affected | What is happening? | What will be affected? | Actions |
---|---|---|---|---|
2018-02-06 07:00 | iForge | Quarterly Maintenance (20180206 Maintenance for iForge) | All Systems will be unavailable during the maintenance. | in progress |
2018-02-05 10:45 | ICCP Networking - OutboundThere is a campus cluster wide networking issue that is intermittently affecting the ability of all devices to be able to contact IPs outside of ICCP. Currently is being investigated. No ETA of return to non-degraded state | A hardware failure on one of the two core switches for ICCP caused that switch to enter a degraded service mode and eventually fail completely. The other core is still functioning properly and is providing connectivity for all ICCP/ADS/DES systems normally for the time being. A hardware replacement RMA was initiated. The hardware will arrive some time during the day Wednesday (02/07/18), at which point the hardware will be replaced and gracefully added back in to production. Full production state is expected by the end of Wednesday at this time. | All ICCP devices have the potential to be affected by a failure of the remaining core. Current aggregate bandwidth outbound is 40Gbps instead of the normal 80Ghps. Scheduler is paused and no new jobs will start.now resumed as of 2018-02-05 19:20 | waiting for RMA |
Report a problem
Upcoming Scheduled Maintenance
...