...
Start | End | What System/Service is affected | What is happening? | What is affected? | Contact Person | Status | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
2024-01-16(17) ??? | Waster leak in Node 1 on campus. | Node1 (campus) has a water leak that may require full power down to address. This will take out several devices that provide connectivity to NCSA. | CARNE ( ICCP ) will be most impacted. NCSA will continue to route most other traffic via alternate paths. If you see connectivity issues please let us know. | neteng@ncsa.illinois.edu |
| |||||||
2024-01-16 0900 | 2024-01-16 1700 | Facility UPS | Second attempt, Preventive Maintenance_Replace UPS capacitors | All systems which are connected to UPS power. During the PM the systems will not lose power but will be unprotected. | rantissi@illinois.edu |
|
...