NPCF Week 17 (4/22-4/28)

  • Tower is cycling more more often of/off due to weather warming up.
  • Sealed data center floor tile penetration to minimized air leakage, CRAH fans speed dropped from 100% to 75% saving energy
  • Floor cleaned.
  • New tower controller is working well.
  • Submitted new facility PM in CMMS.
  • Tedra will be working with WireCrafter to order the cage.  

 

NPCF Week 16 (4/15-4/21)

  • Chilled water issues
    • per Luke, preliminary data shows the issues with chilled water is directly related to the XDP refrigerant temperature set point changes that was made recently not clogged stariners
    • Also early in the season, changes to the chilled water differential  pressure set point change (dropped from 30 to 25) may have contributed.
    • The above 2 cause the XDP valve to operate at higher opening to maintain refrigerant temperature during transition.
    • Operating at higher valve openping is good not bad thing
    • But the nuisance alarms have be addressed 
  • Tower water treatment controller is up and running, it required to stop tower operation for 2 days.
    • All water treatment now under control
    • Reports of Weekly and monthly water treatment will be be generated. 
    • This could be the last week for tower operation for the season.

...