NPCF Week 12 (3/18-324)

  • Water treatment sample was sent to NALCO for the tower and heating loop weekly analysis .
  • New Naclo  water treatment controller was ordered.
  • F&S-Fabricating rack blanking panel.
  • Cooling Tower testing for higher temperature:
    •  Increase the tower control temperature from 50 to 52
    • Added the forth chilled water pumps to reduce pumps power
    • The result was not favorable, as the the temperature  of the chilled water increased the demand by the XDP for flow increased so much the pumps could not maintain the required differential pressure.
    • Reversed the changes to the origenal setting of 50 deg supply chilled water temp
    • Change the towers control point to 45 (50-5) to load the towers and to reduce the import of chilled water from campus, this worked well.

 

NPCF Week 11 (3/11-3/17)

  • Two hard drives failed on the security system (DVR-B)
  • Continued to measure cold aisle temperature in the i/m fiorge.
    • Air supply temperatures is between 50 to 70 depending on the location and mixing with hot air.
    • Temperature at the top of rack around 74 degree.
  • Need to fill all racks empty spaces with blanking panels.
  • Also considering a cold aisle containment for I/m forge aisle.