Work Completed

  • KISTI
    • Continued working on getting PTPFlow to run in Cyberintegrator and pulling results back to a local tupelo instance. Running everything locally works so the next steps will be to run on a cyberintegrator server that stores results back to a specified context instead of locally run context.
    • Met with Jong Wednesday evening to briefly discuss KISTI project
    • Worked on creating GridFTP as a tool for Cyberintegrator. This is still in progress. I was looking on the globus website learning how to create GridFTP as a tool=
  • Cyberintegrator
    • Worked on and resolved CBI-326, preview screen should show something. If a dataset did not have a supported preview, nothing would show up in the info view, not even the metadata for the object. I added a DefaultView for unknown type that displays a generic preview (tooltip says preview not found). The basic metadata (date, creator, etc) gets displayed.
    • Worked on and resolved CBI-376, Login dialog should indicate that it is loggin in. There is a small delay (sometimes longer depending on internet connection) when connecting to a context and the UI would hang with no indication about what is going on. I've added a busy indicator to show that something is happening after pressing the login button.
    • Started looking at CBI-289, adding a KML viewer to Cyberintegrator to determine if it's feasible in the time remaining on the project and adds enough value over other bugs/features. One possibility is to use Nasa Worldwind to provide a KML viewer.
  • Medici
    • MMDB-1174, Login dialog should indicate that it is loggin in. There is a small delay (sometimes longer depending on internet connection) when connecting to a context and the UI would hang with no indication about what is going on. I've added a busy indicator to show that something is happening after pressing the login button. The same fix that was applied to cyberintegrator was applied to Medici since they share similar login code for the desktop.
    • My remaining issues for 1.2 are user guides and any bugs that come up when the desktop client is tested.

Work Planned

  • KISTI
    • Meet with Jong Wednesday to discuss KISTI project progress
    • Continue working on breaking out eAIRS PTPFlow workflow into tools that can be run with cyberintegrator
  • Cyberintegrator
    • Continue working on Cyberintegrator Jira issues & documenting UI suggestions
  • Medici
    • Work on remaining 1.2 issues

Comments

This week went as planned. Monday May 30, 2011 was a holiday so this was a short week.