Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Click on the Execute Analysis ( ) icon to bring up the Execute Analysis wizard again.
  • Expand the Lifeline category and select Electric Power Utility Network Damage (Hazus Style). Click the Finish button.
  • In the analysis graph, click on the _ Electric Power Utility Network Damage (Hazus Style) icon to bring up the form page.
    1. For the Result Name field, specify a name such as Electric Power Network Damage for INA.
    2. For the Power Network field, click the Search ( ) button and find the dataset called Memphis Electric Power Network for INA and click the Finish button to add it to your scenario.
    3. For the Hazard field, click the Search ( ) button and locate the scenario earthquake we just created for the water network damage. If you used the example name previously specified, it should be called Memphis 7.3 Scenario Earthquake. Click the Finish button after you have located the dataset.
  • All other required fields should be filled in so you can now click the Execute button to run the analysis.

...

  • Click on the Execute Analysis ( ) icon again to bring up the Execute Analysis wizard.
  • Expand the Lifeline category and select Interdependent Network Analysis. Click the Finish button.
  • In the analysis graph, click on the Interdependent Network Analysis icon to bring up the form page.
    1. For the Water (or Gas) Connectivity Loss Result Name field, specify a name such as Water Network Connectivity Loss.
    2. For the Power Connectivity Loss Result Name field, specify a name such as Power Network Connectivity Loss.
    3. For the Water (or Gas) Service Flow Reduction Result Name field, specify a name such as Water Network Service Flow Reduction.
    4. For the Power Service Flow Reduction Result Name field, specify a name such as Power Network Service Flow Reduction.
    5. For the Water (or Gas) Utility Network Damage field, select the result we just created from the drop down menu. If you followed the tutorial explicitly, then you should have a dataset called Water Network Damage for INA, select it.
    6. For the Electric Power Utility Network Damage field, select the result we just created from the drop down menu. If you followed the tutorial explicitly, then you should have a dataset called Electric Power Network Damage for INA, select it.